Home > About TMR   
 

About TMR

Click on the links below to view the PDF presentations. The presentations are large files and may take time to open.

About TMR.pdf (3.95 MB)

TMR Photo Gallery.pdf (2.18 MB)

TMR Water Treatment System.pdf (1.74 MB)

TMR Associates was founded in 1996 as a water jet equipment manufacturing company. Since that time, we have changed our focus to provide not only state of the art decontamination equipment, but also to provide a full range of contractor services. We believe our unique approach to designing and building specialty equipment for our own use allows us to respond quickly to client needs and to meet the demands of a changing nuclear industry.

We successfully completed a project at the Rocky Flats Environmental Technology Site (RFETS) in the Fall of 1999. Building 779 at this facility was the first Plutonium contaminated building in the United States to be decontaminated and torn down. We constructed specialized equipment, (i.e., Three-Directional Beam Stripper, Edger, Surface Stripper, etc.) and supplied the site personnel to decontaminate over 50,000 square feet of walls, floors and ceilings with a maximum radiation of 1.5 million dpm. This decontamination project was completed 6 months ahead of schedule.

Our VAC TRAX® equipment, combined with our Waste Stream Separator®, kept workers at a safe distance, reduced the need for respirators, and reduced the expected radioactive waste by 72%, (i.e., 84 barrels actual versus 300 anticipated.)

Our equipment has also been used at other nuclear facilities. We provided a nuclear power plant with specialized equipment called Rotary Tunnel Strippers. This equipment was able to clean the complete circumference of 12 foot pipes in one rotation. By using our equipment, the staffing requirements were reduced substantially and the production rates were increased dramatically.

We have also been successful with asbestos abatement. TMR's VAC TRAX® System removed asbestos for American Abatement. 54,000 square feet of asbestos impregnated mastic floor coating was removed in 14 days with no significant amounts released into the air.

TMR Associates 11575 West 13th Avenue Lakewood, CO 80215 phone(303)202-1533 fax(303)202-1566 info@tmrassociates.org
 ©Copyright 2005 TMR Associates, LLC